Tuba City 6th Grade Classroom Building
Tuba City Unified School District #15
| Tuba City, Arizona |
Photos by: Carlos Murrieta |
|
Owner:
Tuba City Unified School District #15
Principal in Charge:
Terry Worcester AIA, Partner Principal
Project
Architect:
Howell Shay
AIA, Partner Principal
Team:
Howell Shay
AIA, Partner Principal
Consultants:
Kraemer Engineering, Inc.
Arizona Engineering Company
Electrical Design Consultants, Inc.
E.M. Plummer Consulting Engineers
General Contractor: Okland Construction Company, Inc.
Size:
19,636 SF
Cost: $3,711,000
Scheduling:
Design Start: September 2001
Design Completion: July 2002
Construction Start: September 2002
Construction Completion: July 2003
|
|
|
Responding to a growing enrollment within the Tuba City Unified School District the new 6th Grade Classroom building is
located just adjacent to the existing Junior High School. This facility was funded by T.C.U.S.D. Capital funds.
The new 6th Grade Classroom Building has 15 total classrooms. Four (4) pods of essentially three (3) classrooms each,
including a math/science laboratory, language arts/social studies classroom and Navajo language classroom comprise 12 of
the 15 classrooms. In addition, there are three (3) specialty classrooms including Native American studies, in-school
suspension and a computer classroom.
The building is mechanically connected with the new cafeteria to a new central plant with an economical 4-pipe hot/chilled
water mechanical system. This system is expandable to existing and future facilities at the Junior High School campus. The
culturally responsive exterior aesthetics display Navajo patterns and colors through the use of colored concrete masonry and
accent tiles.
|
|