Schneider Shay Pian Worcester Architects
Architecture, Master Planning, Construction Management
Home > Projects > Elementary Schools > San Carlos Intermediate
 

San Carlos Intermediate School
San Carlos Unified School District #4
San Carlos, Arizona Photos by: Carlos Murrieta

Owner: San Carlos Unified School District #4

Principal in Charge:
William Pittenger
RA, CSI, Associate

Project Architect:
Howell Shay
AIA, Partner Principal

Team:
Howell Shay
AIA, Partner Principal


Consultants:

Kraemer Engineering, Inc.

Gookin Engineering, Inc.
Electrical Design Consultants, Inc.

E.M. Plummer Consulting Engineers

Design-TEC Food Facilities, Inc.


General Contractor: Smith/Woods Contracting, Inc.

Size: 56,045 SF

Cost: $7,196,092

Scheduling:
Design Start:
May 2001
Design Completion:
September 2001
Construction Start:
November 2001
Construction Completion:
November 2002


The new San Carlos Intermediate School was designed as the replacement building for the existing Intermediate School located downtown San Carlos. The biggest Challenge was to keep the existing school in session while the new school was under construction. The existing limited space was overcome by the school district acquiring new land across the street extended between them. When construction was complete the existing school was demolished and new play courts where constructed in its place.

Other design parameters consisted of each home room class having a view to the exterior so students would have a constant contact with the exterior environment. Security played an essential role in the circulation of the school with main entry point of contact at the administration area.

Program
The new school accommodates 450 students in the 3rd, 4th and 5th grades. The overall Project consist of 22 classrooms, a computer lab, art room, music room as well as other ammenities such as media center, dinning facility, multipurpose room with stage, full service kitchen, nurses clinic and administration area with offices.