Greenbrier Elementary School
Deer Valley Unified School District #97
Glendale, Arizona Photos by: Robert Pian

Owner: Deer Valley Unified School District #97

Project Architect:
Robert Pian
AIA, Partner Principal


Consultants:
Lowry Sorrenson Wilkinson

Gookin Engineering, Inc.

R.E. Joachim and Associates, Inc.

Electrical Design Consultants, Inc.

E.M. Plummer Consulting Engineers

The Campbell Collaborative

Design-TEC Food Facilities, Inc.


General Contractor:
Phase 1: N. L. Bouth
Phase 2: Norquay


Size:
Phase 1: 29,000 SF
Phase 2: 52,000 SF
Total: 81,000 SF


Cost:
Phase 1: $2,885,513
Phase 2: $5,400,000


Scheduling:
Phase 1:
Design Start:
February 1994
Design Completion:
August 1994
Construction Start:
September 1994
Construction Completion:
September 1995

Phase 2:
Design Start:
April 1998
Design Completion:
July 1998
Construction Start:
August 1998
Construction Completion:
September 1999


Greenbrier Elementary was an existing "portable" elementary campus, which remained in use during the construction period. Phase 1, the "Core" facility, consisted of administration, art, music, media center, and a divisible multipurpose cafeteria/stage facility. When building construction was complete, the existing portables, which housed these functions, were relocated to another campus as needed. The buildings are concrete masonry and metal deck roof. Although the campus is a prototype design, it features a distinctive masonry block pattern, varying color schemes, and a unique entry design. The design also incorporated relocation of existing equipment and furnishings.

Phase 2 included two detached classroom buildings and a classroom kindergarten wing, which allowed for the removal of all remaining portable classrooms and construction of new playfields. Separate kindergarten and primary play areas and apparatus, along with soccer fields, softball fields, dedicated bus, parent drop-off and parking areas.