Benson Primary
Benson Unified School District #9
|
Owner:
Benson Unified School District #9
Principal in Charge:
Howell Shay AIA, Partner Principal
Project
Architect:
Howell Shay
AIA, Partner Principal
Team:
Howell Shay
AIA, Partner Principal
Consultants:
Kraemer Engineering Inc.
Gookin Engineering Inc.
Electrical Design Consultants, Inc.
E.M. Plummer Consulting Engineers
General Contractor: R.E.L.
Size:
16,656 SF
Cost: $2,330,711
Scheduling:
Design Start: March 2002
Design Completion: August 2002
Construction Start: September 2002
Construction Completion: September 2003
|
|
|
This
School Facilities Board funded project was initiated to replace
two buildings on the campus that were in diminished conditions
and to meet the growth needs in Benson. This "L" shaped building
is adjacent to the existing original Primary school, fronts the
road and welcomes a large play field. The program includes 13
K-3rd grade classrooms and new administration offices, all with
exterior covered walkways.
Between the two buildings, a main secure entry was designed which emphasized the fire-lane by constructing a decorative
concrete pathway with landscape nodes. In addition, we reengineered the main play areas for these grades along the bus
drop off area. This project is a prime example of SSPW's ability to design for the existing and future campus needs.
|
|